jeudi 8 août 2013

Striping the hull of my cedar strips SUP board

Construction of the strongback


First strips of cedar on the strongback (bottom of the SUP board)

Some more strips (each one is staple to the strongback and glued to the previous strip)


half of the strip of the bottom are there


All the strip from the bottom of the SUP board are in place


Now I have to remove about 1000 staples from the bottom of the SUP board, 1000 other later form the top face
This is 1000 staples

Here is the bottom of my SUP board finaly removed from the strongback

This is the top of my SUP board.  I'm now sanding it smouth and rounding the edges.